Picture5

UK WETHINGTON RESEARCH LABORATORY

This project consisted of the design and construction of twenty-five laboratories on the unfinished top floor of the Allied Aging Building. We interviewed researchers and administrators of other research labs on campus during design to provide solutions that had not been implemented in previous lab projects. The storage space above the …

Picture3

BETHSAIDA BAPTIST CHURCH

This addition to an existing church was initiated in 2010. We worked with the client to meet their needs for a growing congregation while mindful of budget and site limitations. We prepared schematic drawings and photographic renderings for use in fundraising as well as guiding the building committee through the …

Picture2

REDBIRD RANGER STATION

Exterior renovation included a small addition designed to be compatible with the historic structure for a mobile shelving storage system, all new roofing, storm windows, repair of rotten wood, stone repair and painting. Interior renovation included all new finishes, wood floor refinishing, painting, ceilings, lighting and new HVAC systems. Bathrooms were …

Picture1

MOREHEAD METHODIST CHURCH

Our firm joined forces with Packs, Inc. as a design-build team for an 18,000 s.f. addition to the existing Methodist Church in Morehead, Kentucky. We worked directly with the Owners to provide new classrooms and fellowship hall for budgeted funds. We provided full construction drawings and made required submissions for …

Picture9

UK MEDICAL ADMISSIONS

The Owner hired our firm to design a new Admissions Office for incoming medical students. They asked that it be impressive, light and airy, more contemporary than typical hospital environment. Existing rooms were demolished adjoining the double-wide corridor to create this space. The serpentine frameless glass wall maintained privacy, yet …